[1]
Y. Ding and G. Chen, “Joint Prediction Model of Reservoir Parameters Based on Multimodal Transformer Graph Neural Operator Physical Constraint Network”, ISTAER, pp. 70–89, Feb. 2026, doi: 10.71451/ISTAER2604.